Rampion Offshore Wind Project



The 400-megawatt (MW) Rampion project represents Enbridge’s first foray into the offshore renewables market.

Enbridge Inc. announced in November 2015 that it had acquired a 24.9-percent stake in the Rampion project, which had been unveiled to the public in May by E.ON Climate & Renewables UK. With 116 Vestas turbines producing 3.45 MW of power apiece, the Rampion Offshore Wind Project is expected to be fully operational in 2018.

Enbridge has a well-established renewables business, and a growing expertise in wind power technology, construction and operations. Further developing this expertise through the Rampion project will position Enbridge to participate in further offshore developments.

Read our @enbridge blog posts on the Rampion Offshore Wind Project:

Loading
Processing
There are no assets that meet your criteria.
Please modify the filters.

Project overview:

  • Type: Wind energy project
  • Status: Under construction
  • Location: English Channel, 13 to 20 km south of Brighton
  • Expected in-service date: 2018
  • Expected capacity: 400 MW
  • Expected number of turbines: 116
  • Expected equivalent homes served: 315,900

Project Information: