Project OverviewThe proposed Stonefell Project is made up of the Stonefell Terminal and the Stonefell Pipelines. Located near Bruderheim, Alberta, the Stonefell Project is an expansion of Enbridge Athabasca’s pipeline system in Alberta. In addition to other functions, the Stonefell Project will provide the Heartland Upgrader with access to oil terminal and transfer services in the Edmonton area. The project’s batching, pumping, metering and blending facilities will consist of six 150,000-barrel tanks as well as receipt and delivery pipelines and laterals. The terminal and pipelines are to be remotely operated from the Enbridge Control Centre in Edmonton. Both the Heartland Upgrader and the Stonefell Project are to be located within the Heavy Industrial Policy Area of the Alberta Industrial Heartland (AIH). The AIH is located northeast of the City of Edmonton and includes portions of the municipalities of the City of Fort Saskatchewan, Strathcona County, Sturgeon County and Lamont County. Project TimelineSubject to regulatory approval, the Stonefell Terminal is scheduled to be in service by March 2008 to coincide with the start-up of the Heartland Upgrader. Construction of the proposed Stonefell lateral pipelines is slated to begin in the first half of 2007. |
|
© 2006 Enbridge Inc. All rights reserved.
|