Construction is scheduled to start in January 2023 and is estimated to take 18 to 24 months to complete.
Ingleside Phase 6 Tank Expansion Project
The Ingleside Phase 6 Tank Expansion Project expands the crude oil storage capacity at Enbridge Ingleside Energy Center (EIEC).
The project includes the construction of four additional 490,000 bbl tanks and related equipment at EIEC that will connect to existing facility infrastructure.
Construction is scheduled to start in January 2023 and is estimated to take 18 to 24 months to complete.
The tanks will be phased into service as they are constructed. The first tank is anticipated to be placed in service in 2024.
If you have questions about the project, you can reach us at 361-461-0995 or EIECCommHotline@enbridge.com
Project Overview
- Type: Crude oil tanks
- In-service target date: 2024, phased into service as constructed
- Ownership: Enbridge (100%)