Enbridge has 23 wind farms in operation or under construction, with a total net generation capacity of 1,968 megawatts.
Renewable energy
ENGLISH | FRANÇAIS
Since our initial investment in a wind farm in 2002, we've committed more than C$8 billion in capital to renewable energy and power transmission projects currently in operation or under construction.
Together, our renewable energy projects (either operating or under construction) have the capacity to generate 5,180 megawatts (MW) gross of zero-emission energy (2,173 MW net). Today, Enbridge is one of the largest renewable energy companies in Canada, and we have a diversified portfolio of renewable energy projects.
To date, we’ve invested in:
- 23 wind farms (4,870 MW gross capacity, in operation, pre-construction or under construction)
- 16 solar energy operations (254 MW gross capacity)
- 5 waste heat recovery facilities (34 MW gross capacity)
- 1 geothermal project (22 MW capacity)
- 1 power transmission project (500 MW capacity)
Collectively, those renewable energy projects in operation or under construction (and their 2,173 MW net generation capacity) are enough to meet the electricity needs of about 966,000 homes, based on net generation figures, which exclude our partners' stake in the projects.
View our interactive map to learn more detailed information about Enbridge’s green energy assets.
Enbridge's solar investments can power more than 38,800 homes a year, based on net generation figures.
RENEWABLE ENERGY PROJECTS | LOCATION | IN-SERVICE DATE | GROSS GENERATION CAPACITY (MW) | OWNERSHIP (%) | EQUIVALENT HOMES SERVED (based on net generation) |
---|---|---|---|---|---|
OFFSHORE WIND | |||||
Rampion Offshore | Brighton, England | Q1 2018 | 400 | Enbridge Inc. (24.9%) | 82,137 |
Hohe See | Emden, Germany | Q4 2019 | 497 | Enbridge Inc. (25.4%) | 144,228 |
Albatros (Hohe See Expansion) | Emden, Germany | Q1 2020 | 112 | Enbridge Inc. (25.4%) | 32,502 |
Saint-Nazaire | Saint-Nazaire, France | November 2022 | 480 | Enbridge Inc. (25.5%) | 102,000 |
Fécamp | Fécamp, France | 2023 | 497 | Enbridge Inc. (17.9%) | 72,623 |
Calvados | Bessin, France | 2025 | 448 | Enbridge Inc. (21.7%) | 65,100 |
Provence Grand Large | Port-Saint-Louis-du-Rhône, France | 2023 | 24 | Enbridge Inc. (25%) | 5,240 |
ONSHORE WIND | |||||
Magrath | Magrath, AB | July 2004 | 30 | Enbridge Inc. (33.7%) | 2,726 |
Cruickshank | Tiverton, ON | September 2008 | 8.3 | Enbridge Inc. (51%) | 1,341 |
Underwood | Tiverton, ON | February 2009 | 181.5 | Enbridge Inc. (51%) | 29,320 |
Chin Chute | Taber, AB | December 2009 | 30 | Enbridge Inc. (33.7%) | 3,051 |
Talbot | Ridgetown, ON | December 2010 | 98.9 | Enbridge Inc. (51%) | 18,741 |
Greenwich | Dorion, ON | October 2011 | 98.9 | Enbridge Inc. (51%) | 17,696 |
Cedar Point | Limon, CO | November 2011 | 252.3 | Enbridge Inc. (51%) | 55,651 |
Magic Valley | Harlingen, TX | October 2012 | 203.3 | Enbridge Inc. (80%) | 46,216 |
Saint-Robert-Bellarmin | Saint-Robert-Bellarmin, QC | October 2012 | 82 | Enbridge Inc. (25.5%) | 4,260 |
Wildcat | Elwood, IN | December 2012 | 202.5 | Enbridge Inc. (80%) | 46,215 |
Lac-Alfred | Amqui, QC | January 2013 | 307.5 | Enbridge Inc. (34.4%) | 21,315 |
Massif du Sud | Buckland, QC | January 2013 | 153.8 | Enbridge Inc. (40.8%) | 12,924 |
Blackspring Ridge | Carmangay, AB | May 2014 | 301.3 | Enbridge Inc. (25.5%) | 30,392 |
Keechi Wind | Jacksboro, TX | January 2015 | 110 | Enbridge Inc. (100%) | 33,309 |
New Creek | Moorefield, WV | December 2016 | 102.5 | Enbridge Inc. (100%) | 22,950 |
Chapman Ranch | Corpus Christi, TX | October 2017 | 249.1 | Enbridge Inc. (100%) | 64,101 |
SOLAR | |||||
Sarnia Solar Project | Sarnia, ON | November 2009 | 80 | Enbridge Inc. (51%) | 7,435 |
Tilbury | Tilbury, ON | December 2010 | 5 | Enbridge Inc. (51%) | 430 |
Amherstburg II | Amherstburg, ON | August 2011 | 15 | Enbridge Inc. (51%) | 1,413 |
Silver State North | Primm, NV | April 2012 | 52 | Enbridge Inc. (51%) | 5,910 |
Alberta Solar One | Burdett, AB | April 2021 | 10.5 | Enbridge Inc. (100%) | 1,850 |
Lambertville Solar | West Amwell, NJ | October 2020 | 2.25 | Enbridge Inc. (100%) | 405 |
Heidlersburg Solar | Tyrone Township, PA | May 2021 | 2.5 | Enbridge Inc. (100%) | 500 |
Adams Solar | Grand Marsh, WI | Q2 2023 | 8.3 | Enbridge Inc. (100%) | 2,156 |
Portage Solar | Portage, WI | Q2 2023 | 11.8 | Enbridge Inc. (100%) | 3,277 |
Flanagan Solar | Pontiac, IL | Q2 2023 | 10 | Enbridge Inc. (100%) | 2,131 |
Bedford Solar | Bedford, PA | Pre-construction | 6.8 | Enbridge Inc. (100%) | 860 |
Wheelersburg Solar | Wheelersburg, OH | Pre-construction | 5.3 | Enbridge Inc. (100%) | 815 |
Tompkinsville Solar | Tompkinsville, KY | Pre-construction | 9.6 | Enbridge Inc. (100%) | 2,293 |
Cass Lake Solar | Cass Lake, MN | Pre-construction | 8.8 | Enbridge Inc. (100%) | 2,285 |
Floodwood Solar | Floodwood, MN | Pre-construction | 11 | Enbridge Inc. (100%) | 2,962 |
Deer River Solar | Deer River, MN | Pre-construction | 15 | Enbridge Inc. (100%) | 4,162 |
GEOTHERMAL | |||||
Neal Hot Springs | Vale, OR | August 2013 | 22 | Enbridge Inc. (40%) | 7,250 |
ALTERNATIVE | |||||
NRGreen | Saskatchewan (4), Alberta (1) | 2006, '08, '11 | 34 | Enbridge Inc. (50%) | 5,388 |
SUBTOTALS BY CATEGORY | # Generation Projects | Total Gross MW | Total Net MW | Equivalent Homes Served (net) | |
Offshore wind | 7 | 2,458 | 569 | 503,830 | |
Onshore wind | 16 | 2,412 | 1,399 | 410,208 | |
Solar | 16 | 254 | 179 | 38,884 | |
Other | 7 | 58 | 27 | 13,180 | |
OVERALL TOTAL | 45 | 5,180 | 2,173 | 965,560 |
POWER TRANSMISSION PROJECTS | LOCATION | IN-SERVICE DATE | TRANSMISSION CAPACITY (MW) | OWNERSHIP (%) | EQUIVALENT HOMES SERVED (based on net generation) |
---|---|---|---|---|---|
East-West Tie (EWT) Transmission Project | Northwestern Ontario | March 2022 | 500 | Enbridge (25%) | -- |
TOTAL | 500 | -- |