Policies

At Enbridge, suppliers are required to adhere to all applicable Enbridge policies. To gain an understanding of these requirements, key policies are available below:

Statement on Business Conduct (PDF 4 MB)

Supplier Code of Conduct (PDF 128 KB)

Responsible Procurement Policy (PDF 52 KB)

Tier 2 Spend Program and Subcontractor Reporting Requirements (PDF 61KB)

Safety and Reliability Policy (PDF 70 KB)

Notre déclaration d'éthique professionnelle (PDF 5 MB)

Sustainability Policy (PDF 86.5 KB)

Indigenous Peoples Policy (PDF 114 KB)

Privacy Policy

Artificial Intelligence (AI) Policy

Lifesaving Rules

Safety standards at Enbridge

For contractors working for Enbridge operations or projects, the following documents set out the minimum safety requirements:

Applicable to all Enbridge project contractors Business unit safety specification Additional documents for Enbridge project contractors Applicable drug and alcohol policy (see further Projects Safety Management Standard 9.26)
Liquids Pipelines (LP) Canada Enbridge Projects Safety Management Standard

 

LP Contractor Safety Specifications

Subcontractor Safety Checklist

Canadian Contractor Alcohol and Drug Policy
Liquids Pipelines (LP) U.S.

LP Contractor Safety Specifications

Project Hand Protection Specifications (U.S. only)

U.S. DOT Contractor Drug and Alcohol Policy

U.S. Non-DOT Contractor Drug and Alcohol Policy
Gas Transmission and Midstream (GTM) Canada

GTM Construction Safety Manual

GTM Westcoast-Specific Addendum to GTM Construction Safety Manual

Canadian Contractor Alcohol and Drug Policy
Gas Transmission and Midstream (GTM) U.S.

GTM Contractor Safety Specifications

Project Hand Protection Specifications (U.S. only)


Gas Distribution and Storage (Canada)

Contractor Safety Management Standard

 Canadian Contractor Alcohol and Drug Policy

Safety orientation access for contractors:

Contractors engaged in Enbridge projects should consult with their Enbridge Safety Representative regarding the Annual Contractor Safety Orientation delivery in the event that other means of completing the orientation have been provided (e.g. FDC delivery).

For anyone working within GTM or LP operations, the following safety standards apply: