Skip to content Skip to footer
  • Emergency Contacts
  • Informational Postings
  • Vendors/Suppliers
  • Contact Us

Main Menu Button

Menu
Enbridge home Enbridge home
  • About
  • Investors
  • Projects
  • Sustainability
  • News
  • Careers
  • Maps
Search
Close Modal
  1. Home
  2. Projects and Infrastructure
  3. Public Awareness
  4. Sequoia Solar Project
  5. Project Updates


  • Twitter Logo The logo for Twitter in a light grey color
  • Facebook Logo The logo for Facebook in a light grey color
  • LinkedIn Logo The logo for LinkedIn in a light grey color
  • Envelope A rectangular envelope in a light grey color

Sequoia Solar Project

Return to project

  • Twitter Logo The logo for Twitter in a light grey color
  • Facebook Logo The logo for Facebook in a light grey color
  • LinkedIn Logo The logo for LinkedIn in a light grey color
  • Envelope A rectangular envelope in a light grey color

Project Updates

Enbridge is currently finishing the first phase of construction on the project and site preparation has already begun on Phase 2. During this time, we continue to ask those that are travelling in and around the project area to do so with caution as there will be increased activity on local roads.

Back to top
Enbridge: Life Takes Energy

Operations

  • Liquids Pipelines
  • Gas Transmission, Midstream and LNG
  • Gas Utilities
  • Renewable Energy

  • Enbridge Sustain
  • Our Leadership
  • Our Values
  • Our Commitment to Safety
  • Our Public Awareness Program
  • Corporate Governance

  • Careers
  • Accessibility
  • Contact Us
  • Emergency Contacts
  • Safe Digging

© 2025 Enbridge Inc. All Rights Reserved

  • Manage Cookies
  • Informational Postings
  • Contact Us
  • Privacy Statement
  • Terms of Use
  • X formerly Twitter
  • facebook
  • linkedin
Detected Location: Location not set Change location
Close location panel