Line 3 Replacement Hydrostatic testing: Performance under pressure

One of the final steps on the L3R project is hydrostatic testing of the new line, to demonstrate that the pipeline will withstand the operating pressure for which it was been designed. Megan, a Supervisor for Line 3 Technical Services, explains.