Teamwork in motion: Preparing pump stations

Watch as crews safely and carefully maneuver the last of eight pump station electrical control buildings into place along the Line 3 replacement corridor. To minimize environmental impact, the winding access road was specifically designed to avoid existing wetlands. “Everybody’s worked together and it’s been well executed,” says Eric, a quality specialist with Enbridge.