Skip to content Skip to footer
  • Emergency Contacts
  • Informational Postings
  • Vendors/Suppliers
  • Contact Us

Main Menu Button

Menu
Enbridge home Enbridge home
  • About
  • Investors
  • Projects
  • Sustainability
  • News
  • Careers
  • Maps
Search
Close Modal
  1. Home
  2. Projects and Infrastructure
  3. Public Awareness
  4. Orange Grove Solar Project
  5. Project Calendar


  • Twitter Logo The logo for Twitter in a light grey color
  • Facebook Logo The logo for Facebook in a light grey color
  • LinkedIn Logo The logo for LinkedIn in a light grey color
  • Envelope A rectangular envelope in a light grey color

Orange Grove Solar Project

Return to project

  • Twitter Logo The logo for Twitter in a light grey color
  • Facebook Logo The logo for Facebook in a light grey color
  • LinkedIn Logo The logo for LinkedIn in a light grey color
  • Envelope A rectangular envelope in a light grey color

Project Calendar

In fall 2024, panel installation will begin with plans to be completed before the end of the year. Major deliveries to the site should end around this time, too. This will lead into electrical installation and testing. Our anticipated commercial operation date is mid-2025.

Back to top
Enbridge: Life Takes Energy

Operations

  • Liquids Pipelines
  • Gas Transmission, Midstream and LNG
  • Gas Utilities
  • Renewable Energy

  • Enbridge Sustain
  • Our Leadership
  • Our Values
  • Our Commitment to Safety
  • Our Public Awareness Program
  • Corporate Governance

  • Careers
  • Accessibility
  • Contact Us
  • Emergency Contacts
  • Safe Digging

© 2025 Enbridge Inc. All Rights Reserved

  • Manage Cookies
  • Informational Postings
  • Contact Us
  • Privacy Statement
  • Terms of Use
  • X formerly Twitter
  • facebook
  • linkedin
Detected Location: Location not set Change location
Close location panel